Skip to main content
Illustrative scenario

Plant server room: after-hours monitoring

Know within minutes that the air conditioning stopped, not the next morning.

This is an illustrative scenario with a hypothetical plant, not an Uptrol customer. The figures are estimates from the assumptions listed below, not achieved results.

Industry
Plant office, small server room
Assumed size
2 racks, 2 air conditioners, 1 UPS, no night staff
Scope
Uptrol Phòng máy
Estimated rollout time
1–2 weeks

Estimated benefits

6Measuring points
10–15 minAlert on rapid temperature rise within
Headline estimate24 hoursMonitoring per day
See how we calculated

Assumptions

Racks2
Measuring points (climate, leak, UPS)6
Read interval1 min
Window for temperature rate of rise10–15 min

Calculation

  • 6 = 6
  • Read every 1 min, rate of rise over 10–15 min = 10–15 min
  • Alerts after hours and on holidays too = 24 hours

Real response time depends on who receives the alert; have at least two recipients and an after-hours procedure.

Context

The hypothetical room runs the plant’s ERP and cameras. Domestic air conditioners do not restart after a power cut; the UPS battery has never been checked.

Nobody watches the room outside office hours.

What Uptrol deploys

  • Temperature and humidity sensors at the rack fronts and near the air conditioners
  • A water-leak cable under the indoor units
  • UPS status over SNMP: input, battery, load
  • Threshold and rate-of-rise alerts sent to 2 people

Architecture

  1. 01Modbus sensors and the UPS SNMP card
  2. 02A small gateway in the room
  3. 03Uptrol platform: thresholds, trends, alerts
  4. 04Telegram, Zalo, email for the people in charge

Steps

  1. 01Survey the roomRack, air conditioner and UPS positions, management network.
  2. 02InstallDone in half a day without stopping systems.
  3. 03Set thresholdsBased on equipment inlet temperature guidance and actual conditions.
  4. 04Test alertsSimulate a power cut and an air-conditioner stop to check recipients.

Related solution: Electronics · Related software: Uptrol Server Room

Send your plant’s figures and Uptrol will recalculate with real assumptions.

Calculate for my plantAll scenarios

What do you need to monitor or automate?

Tell us about your plant, station or server room. We will reply with a concrete approach and next step.